Design and print-file preparation are available now — manufacturing and final pricing are quoted separately
Back to all products
Illustrative review render — not a photo of an actually manufactured product.
Retail & productsRequest a quote
Product & Mailer Boxes
A standalone box design with a dieline matched to the required size and use.
Specification-based quote
We confirm pricing after size, material, quantity, and finishing are selected.
Available sizes
- Small product carton
- Medium mailer
- Custom size
Proposed materials — not verified
- White board
- Kraft board
- Corrugated
Finishing options
- Matte
- Spot UV
- Foil
Use cases
- Retail products
- Shipping and delivery
Pre-production artwork setup
Dieline and print file
These are artwork-preparation requirements, not a final manufacturing template. Production starts only after the supplier dieline and proof are approved.
Review concept onlySupplier dieline required
Dieline and safe zones
Supplier cut, crease, and glue dieline
- Separate cut, crease, perforation, and glue lines into named layers.
- Confirm every panel orientation before placing copy and logos.
- Keep critical artwork away from folds and the glue flap.
Print-file setup
- CMYK color mode with any spot colors clearly identified.
- Images at 300 PPI at final size unless the supplier approves otherwise.
- Outline fonts or package them when licensing permits.
- Keep dieline strokes out of the final printable artwork.
Required from supplier
- Official dieline or print-area template with revision number.
- Approved stock, thickness, print method, and finishing process.
- MOQ, price, production lead time, and shipping terms.
- Digital or physical proof approved by the owner before production.
Files delivered after approval
- Print-ready PDF after the supplier template is approved.
- Editable source file with organized layers.
- Low-resolution preview marked REVIEW.
- Specification sheet recording size, stock, colors, and revision.
Before manufacturing, we confirm size, material, quantity, and finishing, then approve the supplier dieline and final proof with you. Production never starts without your approval.